Massey Tunnel vs. Massey Bridge Once Again

Price Tags

shrinking-industrial-lands-for-port-metro-vancouver

Douglas Massey, the son of George Massey the MLA that championed the design and development of the Massey Tunnel which opened in 1959 has weighed in to the Delta Optimist about the proposed Massey Bridge replacement. Massey responds to comments that the tunnel is not ecologically prudent, warranting its removal.

“The George Massey Tunnel was built below the riverbed and does not interfere in the migration of salmon or other fish species, nor does it interfere in the flight path of birds. Should we not be more concerned about the environmental effects of a high level bridge, hundreds of feet in the air, combined with the new overhead high voltage transmission lines (that presently go under the river bed in the tunnel)? Would this not result in more bird kill?

Or with the proposal to remove the George Massey Tunnel and to dredge the riverbed deeper to make the Fraser…

View original post 118 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s